EUNO.NEWS EUNO.NEWS
  • All (7970) +28
  • AI (1325) +4
  • DevOps (398) +2
  • Software (3928) +15
  • IT (2299) +7
  • Education (20)
  • Notice
  • All (7970) +28
    • AI (1325) +4
    • DevOps (398) +2
    • Software (3928) +15
    • IT (2299) +7
    • Education (20)
  • Notice
  • All (7970) +28
  • AI (1325) +4
  • DevOps (398) +2
  • Software (3928) +15
  • IT (2299) +7
  • Education (20)
  • Notice
Sources Tags Search
한국어 English 中文
  • 10 hours ago · it

    TSMC brings its most advanced chipmaking node to the US yet, to begin equipment installation for 3mn months ahead of schedule — Arizona fab slated for production in 2027

    Fab 21 phase 2 shell is complete, fab is on track for equipment move in in mid-2026 and for volume production in 2027....

    #TSMC #semiconductor #chip manufacturing #advanced node #Arizona fab #2027 production #equipment installation
EUNO.NEWS
RSS GitHub © 2025