How do you keep engineering context alive when requirements change? Post:
Source: Dev.to
Scenario
- We document requirements thoroughly.
- Engineering builds the feature.
- Three months later, a modification is needed.
Problem
- No one remembers why certain decisions were made.
- Engineering must reverse‑engineer the “why” before making changes.
- The documentation exists, but it doesn’t capture the discussions, debates, and trade‑offs that occurred during the build.
- When asking “why is it built this way?”, the typical answers are “let me check Slack” or “I think we discussed this in a meeting, but I’m not sure which one.”
Question
Is this an accepted cost of product development, or are there processes, rituals, or habits that can keep this context alive?
Note: I’m not looking for specific tools—just effective processes or practices.