Analyzing TSMC's fab expansion roadmap — multi-fab N2 ramp, CoWoS, SoIC, and uncorking bottlenecks
Source: Tom’s Hardware

(Image credit: Getty Images / Jimmy Beunardeau)
Swipe to scroll horizontally
TSMC’s new or ramping production facilitiesSite Name
Phase
Capabilities
Fab Location
**Status **
Fab 20
1, 2
A16, N2
Hsinchu, Taiwan
Ramping
Fab 21
2
N3
Phoenix, Arizona
Equipping
Fab 21
3, 4
A16, N2
Phoenix, Arizona
In construction
Fab 22
1
A16, N2
Kaohsiung, Taiwan
Ramping
Fab 22
2, 3
A16, N2
Kaohsiung, Taiwan
Equipped, ramping in H2 2026
Fab 23 - JASM
2
Down to N3
Kumamoto, Japan
In construction as of January 2025. Construction stalled.
Fab 24 - ESMC
1
N12, N16, N22, N28
Dresden, Germany
In construction as of August 2024
Fab 25
1
A14, A13, A12
Taichung, Taiwan
In construction
Image
1
of
4
(Image credit: TSMC)Image
1
of
2
(Image credit: TSMC)Image
1
of
2
(Image credit: TSMC)Image
1
of
2
(Image credit: TSMC)Image
1
of
3
(Image credit: TSMC)Image
1
of
3
(Image credit: TSMC)
Anton Shilov is a contributing writer at Tom’s Hardware. Over the past couple of decades, he has covered everything from CPUs and GPUs to supercomputers and from modern process technologies and latest fab tools to high-tech industry trends.